Dietary supplements are prescribed for products intended to supplement the diet, which may contain one or more of the following dietary ingredients, a vitamin, a mineral, an herb (herbal) or other plant, an amino acid, a food component used to increase the total daily intake to supplement the diet, or a concentrate, metabolite, component, extract or combination of the above ingredients. It also includes approved new drugs, vitamins or biologics that have been marketed as dietary supplements or food products before they are approved, issued or licensed.
Small Molecule Peptides Powder:Bovine bone oligopeptide powder,Fish collagen peptide powder,Sunflower disk oligopeptide powder Dietary Supplements Ingredients,Dietary Ingredients,Dietary Supplement Ingredient,Nutrition Enhancers Shaanxi Zhongyi Kangjian Biotechnology Co.,Ltd , https://www.zhongyibiology.com
Oat protein peptide powder,Corn oligopeptide powder,Soybean peptide powder,Whey protein peptide.
Amino acids include glycine, alanine, valine, leucine, isoleucine, methionine (methionine), proline, tryptophan, serine, tyrosine, cysteine, phenylalanine, asparagine, glutamine, threonine, aspartic acid, glutamic acid, lysine, arginine, histidine.
Install dehydrated vegetable dryer to operate correctly
With the development of technology, this dryer has the ability to meet large production, diversification, centralized control and continuous production. It has the advantages of high efficiency, energy saving, etc., and in order to work better, it needs to be very careful during installation. , step by step as required.
Dehydrated vegetable dryer installation:
1. Draw the basic line: Make the cross line, the elevation line and the center mark on the basic target board to be easy to use, accurate and consider not to be covered after the base is installed.
2. Install the base and the tug: shovel the position of the horn, draw the base, the center line of the tug, according to the requirements of the drawings, find the installation position of the base and the tug, level and correct, first grout the foundation hole, and the concrete reaches a certain strength. When the anchor bolts are tightened, the cylinders are installed after the inspection is passed.
3. Install the cylinder and the rolling ring: firstly install the rolling ring on the cylinder. The concave joints required for fixing should be arranged in a reversed and reversed manner, and the thickness of the horn should be adjusted to keep the contact between the rolling ring and the concave joint. For the corresponding clearance, do not agree, and spot weld the concave joint bolt head and the cylinder body.
4. Install the big gear: Check the interface of the mating surface before installation, there must be no collision marks, clean the contact surface between the large gear and the cylinder, then carefully align the two halves of the gear and tighten the interface bolts, then install the large gear in the cylinder Physically. Rotate the barrel and check the radial runout and lateral swing of the large gear until the calibration is passed.
In general, the residence time of the mesh belt type dehydrated vegetable dryer in the middle section and the final drying section is three to four times that of the initial drying section, and the thickness of the paving is two to three times that of the initial drying section, effectively improving the drying. The output provides conditions for users to produce in large quantities in batches.